Over 400 mw equipment produced
The oldest working device is over 25 years old
Product development is done by in-house specialists
Own installation and maintenance team

References

CustomerFuelPowerProjectInstalledDescription

Saxwerk AB

Wood chips and bark

8 MW

40 bar steam boiler plant

2020

Manufacturing and installation of fuel push floor ladders, conveyors, and flue gas system.

Utilitas Eesti AS

Wood chips and bark

15 MW

Flue gas condenser and ESP for Jõgeva 6 MW boiler plant

2019

Design and construction of a flue gas condenser and electrostatic precipitator for the existing 6 MW wood chip boiler of Jõgeva district heating plant with the necessary reconstruction and modification works.

Adven Eesti AS

Wood chips and peat; 15-55%

2.5 MW

Hot water boiler plant of Narva-Jõesuu city

2018

Hot water boiler plant of Narva-Jõesuu city, built for AS Adven Estonia and running on wet biofuels and peat, with a nominal output capacity of 2.5 MW- turnkey delivery.

Saxwerk AB

Wood chips and bark

15 MW

Gällö Timber 15 MW hot water boiler plant

2017

Technological design and manufacturing of submerged and scraper conveyor, boiler in feeder system, and hot water piping. Installation in Gällo.

Utilitas Eesti AS

Wood chips and bark

7 MW

Flue gas condenser for Haapaslu 7 MW boiler

2017

Design and construction of a flue gas condenser for the existing 7 MW wood chip boiler with the necessary reconstruction and modification works.

Saxwerk AB

Sludge

120 m3/h

Flue gas condenser for Haapaslu 7 MW boiler

2017

A sludge container made for Saxwerk AB with moving push floor and transport spiral conveyor. Installation in Norway.

Saxwerk AB

Sludge

120 m3/h

GE Boden Ash discharge system

2017

Silo bottom, sliding frame, discharge screw, and an ash handling system installation in Boden.

Saxwerk AB

Sludge

100 m3/h

Purac, Skogan discharge system

2017

A sludge container made for Saxwerk AB with a moving push floor bottom and a transport auger. Installation in Sweden.

Saxwerk AB

wet wood chips and bark

8 MW

Construction of a boiler house for wet wood chipping and bark heating with a nominal capacity of 8 MW for the Hedlunds Timber sawmill in Sweden.

2017

Construction of a boiler house for wet wood chipping and bark heating with a nominal capacity of 8 MW for the Hedlunds Timber sawmill in Sweden.

Utilitas Eesti AS

Biofuel

7 MW

A flue gas condenser designed, manufactured and installed for Utilitas Eesti AS for the boiler of the city of Keila with a capacity of 7 MW for the beneficial use of waste heat in cooperation with Scheuch GmbH.

2016

The flue gas condenser designed, manufactured, and installed for Utilitas Eesti AS for the city of Keila biofuel boiler with a capacity of 7 MW for the beneficial use of waste heat in cooperation with Scheuch GmbH.

Utilitas Eesti AS

Biofuel

10 MW

A flue gas condenser designed, manufactured and installed for Utilitas Eesti AS for the boiler of the city of Valga with a capacity of 10 MW for the beneficial use of waste heat in cooperation with Scheuch GmbH.

2016

The flue gas condenser designed, manufactured, and installed for Utilitas Eesti AS for the biofuel boiler of the city of Valga with a capacity of 10 MW for the beneficial use of waste heat in cooperation with Scheuch GmbH.

AS Adven Eesti

Biofuel

-

Replacement of a depreciated steam boiler running on biofuel performed for AS Adven Eesti.

2016

Exchange of the depreciated DKOP4 steam boiler running on bio fuel by AS Adven Eesti with a LOOS-ULS 7000 boiler in Põltsamaa.

AS Maru

Biofuel

10 MW

Installation work of a wet biofuel thermal oil boiler with a nominal capacity of 10 MW, heating systems, pipelines and electrical and automation equipment performed for OÜ Kohila Vineer.

2016

Installation work of wet biofuel thermal oil boiler, heating systems, pipelines, and electrical and automation equipment of the company WIESLOCH GmbH with a nominal capacity of 10 MW for OÜ Kohila Vineer (Latvijas Finieris Group).

AS Adven Eesti

Biofuel, Peat

2.5 MW

A hot water boiler house with a power of 2.5 MW, built for AS Adven Eesti, Ekseko farm, which runs on moist biofuels and peat.

2015

The new hot water boiler house with a nominal output of 2.5 MW, built for AS Adven Eesti, Ekseko farm, working on moist biofuels and peat – turnkey delivery.

Latvia HoSt

Biofuel

11 MW + 3 MW

Construction and installation of Rezekne CHP biofuel cogeneration plant.

2015

Rezekne CHP biofuel cogeneration plant equipment and installation. Nominal heat capacity 11MW and electricity 3MW.

Linnamäe Kodu

Biofuel

720 kW

Linnamäe settlement's new bio-fuel boiler house with nominal output power of 720 kW.

2014

A new boiler house built on Linnamäe Kodu working on biofuels with a nominal output power of 720 kW – turnkey delivery.

AS Eraküte

Solid fuels

6 MW

Construction of a new solid fuel boiler house in the city of Jõgeva with a nominal output power of 6 MW.

2013

AS Eraküttele Jõgeva city’s construction of a new solid fuel boiler house with a nominal output power of 6 MW.

Uuemõisa Teenuse AS

Peat, Solid fuels

2.5 MW

A new solid fuel boiler house with a capacity of 2.5 MW built for AS Uuemõisa Teenus.

2013

Construction of a new solid fuel (mainly peat) boiler house with a nominal output of 2.5 MW built for AS Uuemõisa Tenus – turnkey delivery.

Baltic Biogas OÜ

Biogas

2 MW

Delivery, installation, start-up and tuning of a biogas engine and generator (2 MW) for the Aravete Biogas cogeneration plant.

2012

Delivery, installation, start-up, and tuning of a 2 MWe biogas engine and generator for the Aravete Biogas cogeneration plant with all additional equipment – turnkey delivery.

Eesti Energia

Biofuel

8 + 2.4 MW

Design, manufacture and installation of biofuel handling, combustion, ash separation, etc. systems for a new biofuel-powered steam cycle cogeneration plant (8 MWs + 2.4 MWe) for the city of Valka.

2012

Design, manufacture, and installation of biofuel handling, combustion, ash separation, etc. systems for a new biofuel-powered steam cycle cogeneration plant (8 MW + 2.4 MWe) for the city of Valka. Installation work of high-pressure steam boiler, turbine, condenser, and cooler.

HoSt Imtech-Vonk v.o.f.

Biofuel

-

Manufacture, delivery and installation of biofuel storage, transport and combustion equipment for the new combined heat and power plant in Meerhowen.

2011

Manufacture, delivery and installation of biofuel storage, transportation and combustion equipment for the new combined heat and power plant in Meerhowen, Netherlands.

Saxlund International GmbH

Sludge

100 tons

Manufacture and installation of a 100-ton sludge tank at the water treatment plant in Siauliai, Lithuania.

2011

Manufacture and installation of a 100-ton sludge tank for the German company Saxlund International GmbH at the water treatment plant in Siauliai, Lithuania.

SIA „Dizaina un poligrafijas nams”

thermal oil

1 + 1 MW

Construction of a thermal oil boiler house with a capacity of 1 + 1 MW on a turnkey basis.

2011

For the company SIA “Dizaina un poligrafijas nams,” the construction of a boiler house with a capacity of 1 + 1 MW using thermal oil as a heat carrier by the turnkey method.

Baltic Biogas OÜ

-

2 x 3000 l

Installation of activated carbon filters between the Tallinna Prügila gas station and the combi station.

2011

Installation of 2 x 3000 l activated carbon filters between the Tallinna Prügila gas station and the combi station.

AS Ecomont

Natural gas

1 + 2 MW

Construction of a new natural gas-fired boiler house (1 + 2 MW) for the psychiatric clinic of the Northern Estonian Regional Hospital as the main contract.

2010

Construction of a new natural gas-fired boiler house (1 + 2 MW) for the psychiatric clinic of the Northern Estonian Regional Hospital as the main contract.

AS Eraküte

Biofuel, Biomass

7 MW

Construction of a new biomass fuel boiler with a capacity of 7 MW for the Tartu department of AS Eraküte.

2009

Construction of a new biomass fuel boiler set with a capacity of 7 MW, a flue gas condenser scrubber inlet with a capacity of 14 MW, and a new biofuel warehouse with a mechanized capacity of 1500 m³ for the Tartu department of AS Eraküte.

OÜ Lihula Soojus

Biomass, Straw and Wood chips

1800 kW

Construction of OÜ Lihula Soojuse's new fully automated boiler house with a capacity of 1,800 kW, working on straw, herbaceous biomass and wood chips.

2009

Construction of OÜ Lihula Soojuse’s new fully automated boiler house with a capacity of 1,800 kW, working on straw, herbaceous biomass and wood chips. As a technical solution, a new technology was used by burning all the mentioned fuels in one boiler.

AS Balti Spoon (Möhring Group)

Wood processing waste

-

Project management of AS Balti Spoon's new steam boiler house working on wood processing waste, preparation of installation and work projects, work of pressure equipment and cast masonry of hearths.

2009

AS Balti Spoon’s new steam boiler house working on wood processing waste (veneer chips, sanding dust, sawdust) (productivity 9t/h, temp=260 C, working pressure 17 bar) from the manufacturer HURST Boiler & Welding Co. technology construction project management, preparation of installation and work projects, pressure equipment works and hearth casting walls.

AS ESRO

Biofuel

8 MW

AS ESRO biofuel boiler house construction with a nominal capacity of 8 MW.

2008

Construction of AS ESRO’s new wet biomass fuel boiler house with a nominal capacity of 8 MW.

AS Tootsi Turvas (VAPO)

Peat

1750 KW

Construction of a central heating boiler house in Palivere town.

2008

Construction of a central heating boiler house in Palivere town with capacity Q=1750 kW peat heating.

HoSt Engineering B.V

Biofuel

5 MW

Manufacture and delivery of biofuel burning equipment for a combined heat and power plant.

2007

Manufacturing and delivery of biofuel burning equipment (pre-burner set 6 MW, fuel supply warehouse and conveyors, and wet ash disposal) for a combined heat and power plant with a thermal capacity of 5 MWs – 1.2 MWe.

Saxlund AB

Biofuel

8 MW + 10 MW

Manufacture and delivery of 10 MW biofuel combustion equipment for the boiler house and wood pellet factory's hot gas furnaces, which run on moist biofuels and wood waste.

2007

Manufacture and delivery of biofuel burning equipment (pre-fireplaces, fuel supply warehouses, conveyors, ash removal equipment, service platforms for all stations) of a boiler house with a nominal capacity of 8 MW (Skara) and a wood pellet factory (Väggeryd) with a hot gas hearth of 10 MW.

AS Eraküte-Dalkia

Biofuel

10 MW

Construction of a bio-fuel boiler house for the city of Valga.

2006

Construction of a new biomass-fueled central heating boiler house Q=10 MW for the city of Valga.

Fortum Termest AS

Bark, Veneer, wood chips

8 MW

Construction of an 8 MW boiler house powered by biofuels for TVMK's new plywood factory in Kohila.

2006

Construction of a new thermal oil boiler house Q=8 MW working on wood chips, bark, and veneer waste for the new plywood factory of TVMK in Kohila.

AS Tootsi Turvas

Wood pellet

3 MW

AS Tootsi Turba's new automatic wood pellet boiler house 3 MW

2006

Construction of a new 3 MW automatic wood pellet boiler house for AS Tootsi Turvas.

AS Otepää Veevärk

Biofuel

V=300 m3

Construction of a new biofuel warehouse for the Otepää central boiler house V=300 m3

2006

Construction of a new biofuel warehouse for the Otepää central boiler house V=300 m3.

AS Kuressaare Soojus

Biofuel

11 MW + 3 MW

Supply and installation of two biofuel boilers 11 MW and flue gas condenser 3 MW.

2005

Supply and installation of two biofuel boilers 11 MW and flue gas condenser 3 MW.

AS Võru Soojus

Biofuel

10 MW

AS Võru Soojus new biofuel boiler house 10 MW

2005

Construction and installation of AS Võru Sooju’s new 10 MW biofuel boiler house.

Fortum-Termest AS

Biofuel, Shale oil

2 MW + 2 MW

Reconstruction of the central boiler house of Jõgeva Adavere

2004

Reconstruction of the Adavere central boiler house in Jõgeva. DKBR 2 MW for shale oil and DKBR 2 MW for biofuel and renovation of biofuel storage.

Ministry of Defense of the Republic of Estonia

Biofuel

2.5 MW + 2.2 MW

Construction of the central boiler house of Kuperjanov ÜJP Võru department

2004

Construction of the central boiler house of Kuperjanov ÜJP Võru department. Biofuel boiler complex Q=2.5 MW and oil boiler 2.2 MW.

AS Viiratsi Saeveski

Biofuel

4.5 MW

Construction of a new biofuel boiler house for AS Viiratsi Saeveski

2003

Construction of the new biofuel boiler house of AS Viiratsi Saeveski 4.5 MW

AS Natural

Biofuel

3.5 MW

Construction of a new biofuel boiler house (3.5 MW) for AS Natural Saeveski

2003

Construction of a new biofuel boiler house (3.5 MW) for AS Natural Saeveski

AS Toftan

Biofuel

10 MW

Construction of a 10 MW biofuel boiler house for AS Toftan Saeveski

2003

Construction of a new 10 MW biofuel boiler house for AS Toftan Saeveski

AS Eraküte (Dalkia)

Biofuel

7 MW + 15 MW

AS Keila Soojus boiler house reconstruction

2003

Installation of new boilers 7 MW on biofuel + 15 MW on shale oil.

Why are we a good partner?

At Tamult, we pride ourselves on offering our partners and customers unparalleled expertise in the bioenergy field, along with high-quality delivery, installation, and exceptional after-sales service. Our commitment to excellence is not just a promise but a proven track record:

  • Testament to Durability: The oldest device we’ve set up is still operational after over 25 years, symbolizing our commitment to lasting quality.
  • Designed for Longevity: Our modern boiler houses are built to last, with an estimated lifespan of over 20 years and maintenance costs only amounting to 10-20% of the initial purchase price.
  • Innovation at Its Core: Our factory is a hub of innovation, constantly exploring new ways to enhance product efficiency. Rest assured, every product that leaves our facility meets all regulatory standards and customer requirements.

Choose Tamult for a partnership that guarantees not just cutting-edge solutions but also enduring value and support every step of the way.